Skip to main content

Extension of authority to carry out certain fiscal year 2023 projects

Division B · Title XXI: Army Military Construction

Plain-language summaryAI

The section extends the time allowed to complete certain military construction projects authorized in fiscal year 2023 until October 1, 2027, or until new funding for fiscal year 2028 is approved, whichever is later. These projects include upgrades and construction at installations in Germany, Hawaii, Tripler Army Medical Center, and Japan.

AI-generated from this section’s text — a quick orientation, not a substitute for the full text below. Not legal advice.

Funding Table · Sec. 2107.
4 line items

Funding Table 7

4 line items

Line items4 rows
State/CountryInstallation or LocationProjectOriginal Authorized Amount
GermanyEast Camp GrafenwoehrEDI: Battalion Trng Cplx2 (OPS/Veh Maint)$64,000,000
HawaiiFort ShafterWater System Upgrade$33,000,000
Tripler Army Medical CenterUpgrade Potable Water System$38,000,000
JapanKadena Air Force BaseVehicle Maintenance Shop$80,000,000
EDI: Battalion Trng Cplx2 (OPS/Veh Maint)
State/Country
Germany
Installation or Location
East Camp Grafenwoehr
Project
EDI: Battalion Trng Cplx2 (OPS/Veh Maint)
Original Authorized Amount
$64,000,000
Amount: $64M
Water System Upgrade
State/Country
Hawaii
Installation or Location
Fort Shafter
Project
Water System Upgrade
Original Authorized Amount
$33,000,000
Amount: $33M
Upgrade Potable Water System
Installation or Location
Tripler Army Medical Center
Project
Upgrade Potable Water System
Original Authorized Amount
$38,000,000
Amount: $38M
Vehicle Maintenance Shop
State/Country
Japan
Installation or Location
Kadena Air Force Base
Project
Vehicle Maintenance Shop
Original Authorized Amount
$80,000,000
Amount: $80M